SHP Modernisation

HYDROERGIA provides services of comprehensive modernization of existing SHP. Modernization process commences with thorough analysis and an object inventory. We offer many modernization options for SHP together with the accompanying equipment. The investor is presented with the analysis of the project's impact on energy production. Together with an investor we decide about the most beneficial modernization option – aiming at the most efficient investment of PLN 1 in1 kWh in the produced energy. Main elements of a power station modernization:


Turbine modernization

  • an exchange or regeneration of a runner: decision about modernization results from the performed concept and analytical works. In case of a runner exchange or modernization our engineers carry out hydraulic analysis of a turbine. After carrying out necessary calculations using up-to-date numerical methods, the shape of runner blades is changed in order to obtain the biggest efficiency of the device,
  • a guide ring system regeneration: to increase energy production the surface of guide ring blades is regenerated and an automatic regulation of the angle of guide ring blades is installed,
  • a belt drive transmission is exchanged into the one of the highest performance,
  • an exchange of a generator and electrical system meeting present quality standards and adequate safety measures,
  • an installation of an adequately designed sucking pipe enabling recovery of the kinetic energy especially in connection with a Kaplan turbine,
  • an assembly of SHP automation: devices are designed to obtain the highest power of a unit in the function of fluctuating water flow of a river. SHP shall be equipped in a probe, the upper water level as well as a mechanism of automatic guide rings steering. Such solution allows to sustain the same upper water level on a continuous basis with simultaneous turbine operation at the highest momentary power.